Renovations & Extensions · 3–9 months

More house. Same address.

Rear extensions, second-storey additions and full period renovations for homes worth keeping. High-end finish, fixed price, and a builder who has done it in your street before.

Why renovate with us

A $2M renovation on a $4M property beats a $4M rebuild.

The good streets in Brighton, Malvern and Hawthorn are full of houses with the right bones and the wrong back half. We keep the front, the façade and the street value, and give you the kitchen, living and light you actually want — in a fraction of the time a new build takes.

Heritage overlays handledStructural engineering in-houseFixed price
What's included

Four kinds of renovation.

→4–7 mo

Rear extensions

Open-plan kitchen, living and dining opening to the garden. The most common and most valuable renovation we do.

↑5–9 mo

Second-storey additions

Bedrooms, a parents' retreat or a study upstairs without losing the yard. Engineered for the existing structure.

◈6–9 mo

Period home renovations

Victorian, Edwardian and Californian bungalows restored at the front, transformed at the back.

◧3–12 wk

Kitchens & bathrooms

Single-room work sits in our Mid-Range division — same crew, tighter scope. See mid-range →

Renovation process

How a renovation runs.

The same five stages, tuned for a house you're still living in.

1Week 1

Site visit & honest scope

Pat walks the house and tells you what to keep, what to remove and what it'll cost.

2Weeks 2–8

Design & selections

Your architect or our designer. Every finish chosen and priced before you sign.

3Fixed

Contract & staging plan

Fixed price, fixed date, and a plan for where your family lives during each stage.

43–9 months

Build

Dust walls up, services kept live, weekly photo update, David on site daily.

5Handover

Clean, walkthrough, warranty

Builder's clean, defects closed, $20M certificate issued.

Before / after

Drag to see what changed.

Brighton rear extension. Seven months, family living in the front rooms throughout.

BeforeAfter
Before
1960s lean-to
During
Week 14 · steel in
After
Kitchen, living, garden
Renovations

Recent renovations & extensions.

Budget guide

What renovations cost with us.

Indicative ranges for the finish level we build. Pat gives a real number after one visit.

Rear extension

$600K – $1.2M

Kitchen, living, dining + garden connection. 4–7 months.

Second storey

$700K – $1.4M

3–4 bedrooms, bathroom, structural works. 5–9 months.

Full period renovation

$1M – $2.5M

Restoration front, extension rear, all services. 6–9 months.

Renovation questions

The things people worry about.

Can we live in the house during the renovation?+

Usually, yes, for a rear extension. We seal off the work zone, keep a working kitchen and bathroom live, and stage the noisy work. For second storeys and full renovations we'll tell you honestly if moving out for a period will save you money and sanity.

Our house has a heritage overlay. Is that a problem?+

No. Most of our inner-east work sits under overlays. We know what councils in Boroondara, Stonnington and Bayside will approve and we design to it from day one.

How do you stop the budget blowing out?+

By finishing the design and selections before we sign. Blow-outs come from decisions made mid-build. If the decisions are made, the price holds.

Send the address and a sentence about the back of the house.

Pat will tell you what it should cost, what it doesn't need, and when it could start.

Schedule a consultation ↗03 9000 0000 · hello@lambertyork.com
Call PatEnquire ↗